One of the big problems we had when we were first evaluting the house plans was what to do with all of the wasted space between where the prior kitchen ended and where the washer and dryer connections were located.  Since the goal was to double the size of the kitchen, we figured the best thing to do was create a defined room for the laundry area and some pantry space.  And thus the mudroom was born.  We left the hookups where they were, reworked all of the plumbing in the room, added a sink and installed extensive cabinets with a tile counterop to finish it all off.

p1000641 p1000642 p1000640

May 20, 2007

More adventures in tiling

Filed under: Bathrooms, Kitchen, Mudroom — 2500chesterfield @ 6:55 pm

Mudroom countertop and backsplash: img_0598.jpg img_0603.jpg img_0604.jpg

Kitchen backsplash (the start of, anyway): img_0605.jpg img_0606.jpg img_0607.jpg

Master bathroom floor: img_0599.jpg img_0600.jpg

Guest bathroom walls: img_0601.jpg img_0602.jpg

May 15, 2007

The lights are on…well, almost

Filed under: Bathrooms, Bedrooms, Electrical, Kitchen, Living Room, Mudroom — 2500chesterfield @ 9:44 pm

The light fixtures have been installed and the electrical trim out is about 90%…

img_0566.jpg img_0567.jpg img_0568.jpg img_0569.jpg img_0570.jpg

img_0571.jpg img_0572.jpg img_0576.jpg img_0577.jpg

May 4, 2007

More color…

Filed under: Bathrooms, Bedrooms, Kitchen, Living Room, Mudroom, Painting — 2500chesterfield @ 4:33 pm

img_0531.jpg img_0532.jpg img_0533.jpg

May 3, 2007

A touch of color…

Filed under: Bathrooms, Bedrooms, Kitchen, Living Room, Mudroom, Painting — 2500chesterfield @ 9:51 pm

with the trim work done and the bulk of the interior work taken care of it was time to put some color on the walls!

img_0511.jpg img_0512.jpg img_0513.jpg img_0514.jpg img_0515.jpg

img_0516.jpg img_0517.jpg img_0518.jpg img_0519.jpg img_0520.jpg

img_0521.jpg img_0522.jpg img_0523.jpg img_0524.jpg img_0525.jpg

img_0526.jpg img_0527.jpg img_0528.jpg img_0529.jpg img_0530.jpg

April 22, 2007

Good thing we’ve got a mudroom…

Filed under: Mudroom — 2500chesterfield @ 5:26 pm

…because we have plenty of mud…thanks to a lot of rain and the lack of grass on the side of our yard…

img_0500.jpg img_0501.jpg

April 5, 2007

It’s starting to look like a house…

Filed under: Bedrooms, Kitchen, Living Room, Mudroom, Trim & Casework — 2500chesterfield @ 9:39 pm

The trim and casework has started in the house and things are really starting to tighten up and look like a house.  All the windows and doors have been trimmed out and the first of the three built in bookcases are up.  With this in progress most of the walls that didn’t get drywall are now covered.  With any luck we’ll be able to finish this place up soon.

img_0457.jpg img_0458.jpg img_0461.jpg

Cabinets are here!!!

Filed under: Bathrooms, Kitchen, Mudroom — 2500chesterfield @ 9:35 pm

The cabinets for the kitchen, bathrooms and mudroom are finally here and hopefully ready to get installed…

img_0456.jpg img_0462.jpg img_0463.jpg img_0464.jpg img_0465.jpg

February 27, 2007

They blew their horns, and the walls…er, went up?

Filed under: Bathrooms, Bedrooms, Drywall, Kitchen, Living Room, Mudroom — 2500chesterfield @ 10:29 pm

WHOO HOO!!! Drywall is in.  We never thought we’d see this day come!  After a month in suspended animation where we thought we’d be living in a house that had a VERY open floor plan we finally have the drywall up and the first round of mud and tape has been applied.  We had a few areas to fix after the drywall went up, but we are good to go.  There are a few walls where there is no drywall - which was intentional.  We have a number of built-ins and some architectural wood details planned for the fit and finish phase that will hopefully set our house apart. 

2nd Bathroom: img_0359.JPGimg_0360.JPG

2nd Bedroom: img_0361.JPGimg_0362.JPGimg_0363.JPG

Living Room: img_0364.JPGimg_0365.JPGimg_0366.JPGimg_0367.JPGimg_0368.JPG

Kitchen & Dining Room: img_0369.JPGimg_0370.JPGimg_0371.JPGimg_0375.JPGimg_0393.JPG

Mudroom: img_0372.JPGimg_0373.JPGimg_0374.JPG

Master Bedroom: img_0376.JPGimg_0377.JPGimg_0378.JPG

Master Walk in Closet: img_0379.JPGimg_0380.JPGimg_0381.JPG

Master Bathroom: img_0383.JPGimg_0384.JPG

January 26, 2007

Lt. Dan, New Floors!

Filed under: Flooring, Kitchen, Mudroom — 2500chesterfield @ 4:39 pm

After about a weeks worth of work we have new subflooring and sheathing done throughout the parts of the house where the flooring was just a total mess.  This will help out big time now that the new hardwoods are a few days away from being delivered.

The revised dining room/kitchen flooring: img_0287.JPGimg_0288.JPGimg_0289.JPG