2500 Chesterfield Avenue

March 3, 2007

Tonight on This Old House…

Filed under: Deck & Stairs, Framing — 2500chesterfield @ 3:23 am

With the drywall in and the mud and tape drying (and hoping that sanding will be complete this weekend and the primer coat of interior paint up on Monday) we have turned our attention to building a new deck off the back of the house.  We’ve gone with a rather aggressive design and when it is finished it will provide about 176 sq ft of outdoor living space to give us a place to relax and grill out.  With permit in hand we’ve started building with the hope of completing the deck in the next four or five days.  So, far we’ve managed to:

Dig some holes:

img_0400.JPGimg_0403.JPGimg_0404.JPGimg_0405.JPGimg_0406.JPG

img_0407.JPGimg_0409.JPGimg_0410.JPG

Pour some concrete footers (complete with shiny new anchor bolts):

img_0411.JPGimg_0412.JPGimg_0413.JPGimg_0414.JPGimg_0415.JPG

And tear some siding off the house to attach a ledger board:

img_0402.JPGimg_0416.JPGimg_0417.JPGimg_0418.JPG

December 16, 2006

Framing complete!

Filed under: Framing — 2500chesterfield @ 10:40 pm

For the first time something is actually on schedule!  The new piers were built up on Friday – one day ahead of schedule – and the framing was completed on time today (Saturday).  The kitchen has been doubled, the new linen closet in the master bath is complete, the linen closet in the new 2nd bathroom is complete and the archway between the living room and kitchen have been expanded to create the more open floorplan we were looking to accomplish with this remodel.

The expanded kitchen floorplan: img_0263.JPGimg_0265.JPG

The new archway: img_0264.JPG

The new master bath linen closet: img_0267.JPG

The new 2nd bath linen closet: img_0266.JPG

December 14, 2006

Let the framing begin!

Filed under: Framing — 2500chesterfield @ 2:55 pm

img_0232.JPG

The framing of the new interior walls has begun.  The framers made tremendous progress in the first day.  They cut out the larger door opening, as we are increasing the size of the entrance to 36″ from 32″.  They cleaned up the framing around the addition that was put on the front and have framed in the mudroom, new 2nd bathroom, master bedroom closet, 2nd bedroom closet and opened up the entry way inside the master bedroom.  By Saturday the new front door will be completely hung and shimmed and the new header beams doubling the size of the kitchen will be complete.  With any luck the 4 new piers will also be built under the new interior wall load points and we’ll be ready for the plumbing to commence!

The new mudroom: img_0233.JPGimg_0245.JPGimg_0246.JPG

The new front door: img_0235.JPGimg_0238.JPGimg_0249.JPGimg_0250.JPG

The new entryway coat closet: img_0239.JPGimg_0251.JPGimg_0252.JPG

The new second bathroom: img_0241.JPGimg_0242.JPGimg_0248.JPG

The new closet for the 2nd bedroom: img_0243.JPGimg_0244.JPG

The new walk in closet for the master bedroom: img_0247.JPG

The new archway for the master bedroom: img_0258.JPGimg_0259.JPGimg_0260.JPG

Blog at WordPress.com.