2500 Chesterfield Avenue

February 17, 2009

The Master Bedroom and Bath

Filed under: Bathrooms, Bedrooms, On the Market — PJ Mullen @ 9:49 pm

Before the renovation there really wasn’t a master bedroom and bath.  There was only one full bathroom in the house, which we closed off to the main hallway, added a linen closet to and ultimately converted into the master bathroom.

As far as the master bedroom is concerned, there were three different ways to get to the sleeping area before we gutted the joint.  Through the bathroom, through the “third bedroom”/den type area and through what was the closet.  We tore out that closet and the interior door and created an archway that became the entrance to the master bedroom.  We also took about a third of what was the “third bedroom” and converted it into a walk in closet, giving us more than double the closet space that was previously available.  Now there is just one way in or out, unless you count the windows, and it feels more like a true master suite.

p1000647 p1000648 p1000649 p1000650 p1000651

p1000652 p1000653 p1000654 p1000655 p1000656

p1000643 p1000644 p1000645 p1000646

The Second bedroom and bath

Filed under: Bathrooms, Bedrooms, On the Market — PJ Mullen @ 9:11 pm

During the renovation this was one of the trickier parts.  The house, as it was marketed, had three bedrooms, but the middle bedroom had no closet and was the only way to get into what is now the master bedroom without going through a closet or the only full bathroom the house had at the time.  In what should have been that middle bedroom’s closet was a water closet, if you will.  There was a single toilet and a pedastal sink, right behind a set of bi-fold doors.  One of the weirdest things we’d ever seen.

As a result, what is now the second bedroom lost a good chunk of real estate to accomodate the aforementioned water closet.  Combined with a cedar closet that was built out of the opposite corner of the room and a closet bar stuck between the two this room was extremely tiny.

During the design stage we ultimately sacrificed this oddly placed “middle bedroom” and carved it up into a good sized closet for the second bedroom, a walk in closet for the master bedroom and a second full bathroom that the house did not previously have.  It made the flow of the house floorplan a lot more logical.  From an appraisal standpoint this was never a three bedroom house because quantifying a room as a bedroom requires that it has a closet.  Since that “middle bedroom” had a toilet and sink in what was supposed to be its closet it was really just dead space, well, maybe just a glorified den.

Regardless, we reclaimed that wasted space and squared the room off, gave it a functional closet and, ultimately, close access to the second full bathroom in the house.

Second Bedroom p1000624 p1000625 p1000626 p1000627

p1000628 p1000629 p1000630 p1000631

May 22, 2007

Time to do the tiling…

Filed under: Bathrooms, Living Room — 2500chesterfield @ 10:31 pm

I’m not sure if I feel like Fred the baker making the donuts since we’ve been tiling for more than a week already or if I feel like Bill Murray in Groundhog Day since every morning my day starts with firing up the tile saw.  Either way the house is really starting to take shape with the tile coming together.  Both bathrooms are 90% complete and the kitchen backsplash and entryway are the two largest places left to tile.  Without further adieu, here’s today’s progress:

Guest bathroom tub surround: img_0609.jpg img_0610.jpg img_0608.jpg img_0611.jpg

Guest bathroom floor: img_0612.jpg img_0613.jpg

TV picture frame: img_0614.jpg

May 20, 2007

More adventures in tiling

Filed under: Bathrooms, Kitchen, Mudroom — 2500chesterfield @ 6:55 pm

Mudroom countertop and backsplash: img_0598.jpg img_0603.jpg img_0604.jpg

Kitchen backsplash (the start of, anyway): img_0605.jpg img_0606.jpg img_0607.jpg

Master bathroom floor: img_0599.jpg img_0600.jpg

Guest bathroom walls: img_0601.jpg img_0602.jpg

May 18, 2007

Introducing the Taj Ma-Tub

Filed under: Bathrooms — 2500chesterfield @ 10:20 pm

That’s the best name we could think of for it…so, we bit off a little more than we could chew with our first ever tiling job…but it came out quite good!

img_0589.jpg img_0590.jpg img_0591.jpg img_0592.jpg img_0593.jpg img_0594.jpg

May 16, 2007

Time to tile…

Filed under: Bathrooms, Flooring — 2500chesterfield @ 7:12 pm

…the plumbers are expected to trim out the house in a few days, so we have to motor and get the tile done near where they need to install the fixtures…here’s where we are at after about two and a half days into it:

Master Bathroom: img_0573.jpg img_0584.jpg img_0587.jpg

Guest Bathroom: img_0574.jpg img_0575.jpg img_0578.jpg img_0579.jpg

May 15, 2007

The lights are on…well, almost

Filed under: Bathrooms, Bedrooms, Electrical, Kitchen, Living Room, Mudroom — 2500chesterfield @ 9:44 pm

The light fixtures have been installed and the electrical trim out is about 90%…

img_0566.jpg img_0567.jpg img_0568.jpg img_0569.jpg img_0570.jpg

img_0571.jpg img_0572.jpg img_0576.jpg img_0577.jpg

May 7, 2007

And the bathrooms too…

Filed under: Bathrooms — 2500chesterfield @ 9:34 pm

img_0543.jpg img_0544.jpg

May 4, 2007

More color…

Filed under: Bathrooms, Bedrooms, Kitchen, Living Room, Mudroom, Painting — 2500chesterfield @ 4:33 pm

img_0531.jpg img_0532.jpg img_0533.jpg

May 3, 2007

A touch of color…

Filed under: Bathrooms, Bedrooms, Kitchen, Living Room, Mudroom, Painting — 2500chesterfield @ 9:51 pm

with the trim work done and the bulk of the interior work taken care of it was time to put some color on the walls!

img_0511.jpg img_0512.jpg img_0513.jpg img_0514.jpg img_0515.jpg

img_0516.jpg img_0517.jpg img_0518.jpg img_0519.jpg img_0520.jpg

img_0521.jpg img_0522.jpg img_0523.jpg img_0524.jpg img_0525.jpg

img_0526.jpg img_0527.jpg img_0528.jpg img_0529.jpg img_0530.jpg

Older Posts »

Blog at WordPress.com.